Trant

[av_heading heading=’TRANT / WESSEX WATER’ tag=’h2′ color=” style=” padding=’10’]

[av_one_third first]
[av_image src=’https://arlosh.com/wp-content/uploads/2014/01/Trant.png’ attachment=’3207′ align=’center’ animation=’no-animation’ link=’manually,http://www.trant.co.uk/’ target=”]

[av_hr class=’default’ height=’50’ shadow=’no-shadow’ position=’center’]

[av_image src=’https://arlosh.com/wp-content/uploads/2014/01/Wessex_Water.png’ attachment=’3209′ align=’center’ animation=’no-animation’ link=’manually,http://www.wessexwater.co.uk/’ target=”]
[/av_one_third]

[av_two_third]

[av_iconlist position=’left’]
[av_iconlist_item title=’Project’ link=” linktarget=” icon=’43’ font=’entypo-fontello’]
Ashton Avenue Sewage Pumping Station, Bristol, UK
[/av_iconlist_item]
[av_iconlist_item title=’Value’ link=” linktarget=” icon=’ue8c5′ font=’entypo-fontello’]
£9m
[/av_iconlist_item]
[av_iconlist_item title=’Our Role’ link=” linktarget=” icon=’ue855′ font=’entypo-fontello’]
We have supported Trant on over 30 projects throughout the UK. The Ashton Avenue project received interest from many in the industry for its unique approach and the fact the project completed earlier than programmed and under budget.

We were commissioned by Trant to produce the site operation & maintenance manual as well as site layout diagrams, as well as pumping station area-breakdown graphics.

We have a strong history of working with Trant to produce site and process graphics and are currently supporting them on several other projects.
[/av_iconlist_item]
[/av_iconlist]

[/av_two_third]